INSTALLATION
65
2
FLOW CHART OF INSTALLATION
Design kicking-off
Material selection
Inspection of site installation position
Installation of indoor unit
Installation of outdoor unit
Installation of BU module
Installation of
remote
controller
Connection of
power cables
Installation of drainage pipes
Thermal insulation of connection pipes and drainage pipes
Installation of refrigerant pipes
Connection of
transmission
line
Connection of
power cables
Connection of
transmission
line
Assign the
address
Vacuum the system through
the gas and liquid valves
Open the valves
Refrigerant charging
Test run
As-bulit drawing
Delivery of the operating instructions
Installation of
piping adapter
Connection of
power cables
Leakage test
Commissioning of complete unit
Summary of Contents for GKH(12)BA-K3DNA1A/I
Page 1: ...SUPER FREE MATCH SERIES SERVICE MANUAL T1 R410A 50Hz GC201405 CENTRAL AIR CONDITIONERS...
Page 5: ...Super Free Match Service Manual PRODUCT 1 PRODUCT...
Page 27: ...Super Free Match Service Manual CONTROL 23 CONTROL...
Page 28: ...Super Free Match Service Manual CONTROL 24 Control 1 OPERATION FLOWCHART...
Page 30: ...Super Free Match Service Manual CONTROL 26 1 2 Heating Operation...
Page 64: ...Super Free Match Service Manual INSTALLATION 60 INSTALLATION...
Page 122: ...Super Free Match Service Manual MAINTENANCE 118 MAINTENANCE...
Page 144: ...Super Free Match Service Manual MAINTENANCE 140 4 2 3 BU module FXB3A K...
Page 145: ...Super Free Match Service Manual MAINTENANCE N 141 FXB5A K...
Page 207: ...JF00301896...