Super Free Match
Service Manual
INSTALLATION
74
4.2.6
Installation of the Indoor Unit
1)
Requirements on the Installation Location
Ensure the hanger is strong enough to withstand the weight of the unit.
The drainage of the drain pipe is easy.
No obstacle is in the inlet/outlet and the air circulation is in good condition.
Ensure the installation space shown in the following figures is left for the access to maintenance.
It should be far away from where there is heat source, leakage of inflammable, explosive substances, or
smog.
It is the ceiling type unit (concealed in the ceiling).
The power cords and connection lines of the indoor and outdoor units must be at least 1m away from the
TV set or radio to avoid the image interference and noise ( even if 1m is kept, the noise may be
produced due to the strong electric wave).
2)
Installation of the Indoor Unit
Insert the M10 expansion bolt into the hole, and then knock the nail into the bolt. Refer to the Outline
Dimension Drawings of the Indoor Unit for the distance between holes and see the following figures for the
installation of the expansion bolt.
Summary of Contents for GKH(12)BA-K3DNA1A/I
Page 1: ...SUPER FREE MATCH SERIES SERVICE MANUAL T1 R410A 50Hz GC201405 CENTRAL AIR CONDITIONERS...
Page 5: ...Super Free Match Service Manual PRODUCT 1 PRODUCT...
Page 27: ...Super Free Match Service Manual CONTROL 23 CONTROL...
Page 28: ...Super Free Match Service Manual CONTROL 24 Control 1 OPERATION FLOWCHART...
Page 30: ...Super Free Match Service Manual CONTROL 26 1 2 Heating Operation...
Page 64: ...Super Free Match Service Manual INSTALLATION 60 INSTALLATION...
Page 122: ...Super Free Match Service Manual MAINTENANCE 118 MAINTENANCE...
Page 144: ...Super Free Match Service Manual MAINTENANCE 140 4 2 3 BU module FXB3A K...
Page 145: ...Super Free Match Service Manual MAINTENANCE N 141 FXB5A K...
Page 207: ...JF00301896...