Super Free Match
Service Manual
INSTALLATION
83
6)
Backout the install cardboard.
Note:
Please do tighten the nuts and bolts to prevent air conditioner break off.
4.3.6
Drainage hose
1)
Install the drain hose
The diameter of the drain hose should be equal or bigger than the connection pipe’s. (The diameter of
polythene pipe: Outer diameter 25mm Surface thickness
≥
1.5mm)
Drain hose should be short and drooping gradient should at less 1/100 to prevent the formation of air
bubble.
If drain hose cannot has enough drooping gradient, drain raising pipe should be added.
To prevent bent of the drain hose, the distance between hoisting stand should is 1 to 1.5m.
Use the drain hose and clamp attached. Insert the drain hose to the drain vent, and then tighten the
clamp.
Entwine the big sponge on the clamp of drain hose to insulate heat.
Heat insulation should be done to indoor drain hose.
Summary of Contents for GKH(12)BA-K3DNA1A/I
Page 1: ...SUPER FREE MATCH SERIES SERVICE MANUAL T1 R410A 50Hz GC201405 CENTRAL AIR CONDITIONERS...
Page 5: ...Super Free Match Service Manual PRODUCT 1 PRODUCT...
Page 27: ...Super Free Match Service Manual CONTROL 23 CONTROL...
Page 28: ...Super Free Match Service Manual CONTROL 24 Control 1 OPERATION FLOWCHART...
Page 30: ...Super Free Match Service Manual CONTROL 26 1 2 Heating Operation...
Page 64: ...Super Free Match Service Manual INSTALLATION 60 INSTALLATION...
Page 122: ...Super Free Match Service Manual MAINTENANCE 118 MAINTENANCE...
Page 144: ...Super Free Match Service Manual MAINTENANCE 140 4 2 3 BU module FXB3A K...
Page 145: ...Super Free Match Service Manual MAINTENANCE N 141 FXB5A K...
Page 207: ...JF00301896...