Gill Instruments Ltd
_____________________________________________________________________________________________________________
________________________________________________________________________________________________
MetPak/MetPak RG and MetPak Pro Base Stations
Page | 18
Issue 1
Doc. No. 1723-PS-0023
October 2018
Continue to insert all of the contacts you require. Once all of the contacts are inserted squeeze the
2 red retainers (See Arrows A on previous page) into place. NB. The retainer can only be pushed
back into place if the contacts are fully engaged.
Fit the connector to the WindSonic/WindMaster Sensor so that you can finish assembling the
connector.
Screw the back shell onto the connector until it is fully in place. Please note that the final rotations
can be slightly stiff.
Now screw the next part of the connector into place.
Now screw the cable-clamping nut into place.
The connector can now be removed from the WindSonic/WindMaster.
Replace the 31 way WindMaster connector sealing nut with Sealing Nut part 1723-10-109 supplied
with the Base Station unit. This part allows for correct sealing around the outer surface of the wired
10 Metre cable.
NOTE: To disassemble the connector, reverse this procedure.