Gill Instruments Ltd
_____________________________________________________________________________________________________________
________________________________________________________________________________________________
MetPak/MetPak RG and MetPak Pro Base Stations
Page | 19
Issue 1
Doc. No. 1723-PS-0023
October 2018
4.2.2.
WindObserver (Non Heated units) Connector Assembly Details
Wiring between the Base Station wind sensor 10 Metre cable and a Non Heated WindObserver
19-way Cannon connector variant unit is as follows:-
4.2.3.
WindSonic M Heated units Connector Assembly Details
WindSonic M (Heated) RS422 10 Metre Cable Connections to the Heater Power Interface Box
(1723-PK-099).
Note: See also the lid of the Heater Power Interface Box for Connection Details.
Cut off the contact pins connected to the Base Station 10 Metre cable, strip and solder wires.
Connect wires to the Heater Power Interface box as follows:-
Remote Base Station
WindObserver 65/70/75/90 (Non Heated)
10 Metre Cable
19 Way Connector
White/Green
Cable Screen/Drain wires
Green/White
M
Orange/White
R
White/Orange
D
Brown/White
P
White/Brown
C
Blue/White
U
White/Blue
V
No Connection
A, E and H
No Connection
B, F and G
Remote Base Station
Optional Heater Power Interface Box
WindSonic M (Heated)
10 Metre Cable
8 Way Terminal Block
9 Way Connector
White/Green
8
1
Green/White
7
No Connection
Orange/White
6
2
White/Orange
5
3
Brown/White
4
4
White/Brown
3
5
Blue/White
2
6