69
Fryer Operation
EOF 10-10/20
5-04. Removal of Liquid Shortening (Continued from previous page)
8
9
10
12
If holding the Discharge Hose during the next step, be sure the wear thermal hand protection mitts. Some
parts of the hose assembly can become very hot
.
6. Connect the supplied Oil Discharge Hose
⑧
to the Discharge Hose Coupling
⑨
.
7. Place the discharge end into an appropriate hot waste oil Disposal Container
⑩
(Giles Oil Caddy is shown)
8. Place the Pump Discharge Valve Handle
⑪,
inside the right-hand Cabinet, in the
TO DISCHARGE HOSE
position.
9. Place the Pump Switch
⑫
in the
ON
position. Allow the pump to run until all liquid shortening has been pump
into the waste oil Disposal Container.
10. After all the used oil has been removed from the Filter Pan, return Pump Switch to the
OFF
position.
11
Continued on Next Page
Summary of Contents for EOF-20
Page 2: ......
Page 7: ...vi Table Of Contents EOF 10 10 20 Notes ...
Page 13: ...2 Introduction EOF 10 10 20 1 04 Specifications 1 04 1 Overall Dimensions Inches mm ...
Page 15: ...4 Introduction EOF 10 10 20 ...
Page 21: ...10 Installation EOF 10 10 20 ...
Page 23: ...12 Overview EOF 10 10 20 3 01 Basket Lifts and Baskets 4 2 1 3 ...
Page 25: ...14 Overview EOF 10 10 20 3 02 EOF 20 Basket Hanger and Baskets 2 1 3 ...
Page 29: ...Overview EOF 10 10 20 18 3 04 EOF20 Control Panel 6 5 4 3 1 2 7 Lift Switch is plugged 8 9 ...
Page 31: ...20 Overview EOF 10 10 20 3 05 Lower Cabinet EOF10 10 Left Side 1 2 ...
Page 33: ...22 Overview EOF 10 10 20 3 06 Lower Cabinet EOF20 Right Side 2 1 3 4 5 ...
Page 35: ...24 Overview EOF 10 10 20 3 07 Filter Pan Assembly 5 6 3 2 1 4 3 ...
Page 84: ...73 Fryer Operation EOF 10 10 20 Notes ...
Page 85: ...74 Fryer Operation EOF 10 10 20 ...
Page 91: ...80 Cleaning EOF 10 10 20 Notes ...
Page 111: ...102 Parts List EOF 10 10 20 Notes ...
Page 112: ......