CE Mark Compliance
A-1
January 2008
Introduction
For CE Mark compliance, the XDP must meet both the
EMC
and
LVD
directives.
IMPORTANT:
CE Mark compliance is required only for units used
in EEC countries.
EMC Compliance
For
EMC
compliance, the electrical connections must be shielded and
grounded as shown in Table A-1 below. After all the necessary
electrical connections have been made, seal any unused cable entry
holes with standard conduit plugs or equivalent.
Note:
If the instructions in this appendix are followed, the unit will
comply with the EMC Directive 89/336/EEC.
LVD Compliance
For compliance with the European Union’s Low Voltage Directive
(73/23/EEC), the analyzer requires an external power disconnect
device such as a switch or circuit breaker. The disconnect device must
be marked as such, clearly visible, directly accessible, and located
within 1.8 m (6 ft) of the XDP.
Note:
If the instructions in this appendix are followed, the unit will
comply with the Low Voltage Directive (73/23/EEC).
Table A-1: Wiring Modifications for EMC Compliance
Connection
Wiring Modification
Power
1. When connecting the power, select the cable
entry closest to the chassis ground.
2. Use shielded cable* to connect the power to the
XDP enclosure. Connect the shield to the
nearest chassis ground terminal.
3. Connect the power line ground wire to the
nearest chassis ground terminal.
Input/Output
1. Use shielded cable* to interconnect the Model
XDP enclosure with any external I/O devices.
2. Connect the shields to the nearest chassis
ground terminal.
*Wires enclosed in a properly-grounded metal conduit do not
require additional shielding.
Summary of Contents for XDP-H2
Page 3: ...Chapter 1 ...
Page 9: ...Chapter 2 ...
Page 20: ...Chapter 3 ...
Page 28: ...Chapter 4 ...
Page 55: ...Chapter 5 ...
Page 76: ...Chapter 6 ...
Page 80: ...Appendix A ...
Page 81: ...CE Mark Compliance Introduction A 1 EMC Compliance A 1 LVD Compliance A 1 ...
Page 83: ...Appendix B ...
Page 87: ...Appendix C ...