GE H
EALTHCARE
D
IRECTION
2286865, R
EVISION
14
LOGIQ™ 7 S
ERVICE
M
ANUAL
Section 10-3 - Periodic Maintenance Schedule
10-7
Section 10-5
System Periodic Maintenance
10-5-1
Preliminary Checks
The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Table 10-6 System Preliminary Checks
Step
Item
Description
1
Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
2
Paperwork
Fill in the top of the Periodic Maintenance (PM) Inspection Certificate. Note all probes and system
options.
3
Power up
Turn the system power on and verify that all fans and peripherals turn on. Watch the displays during
power up to verify that no warning or error messages are displayed.
4
Probes
Verify that the system properly recognizes all probes.
5
Displays
Verify proper display on the monitor and touch panel.
6
Presets
Backup all customer presets on an CD-R.
Summary of Contents for LOGIQ 7
Page 2: ......
Page 9: ... vii GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL ...
Page 12: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL x ...
Page 116: ...GE HEALTHCARE DIRECTION 2286865 REVISION 14 LOGIQ 7 SERVICE MANUAL 4 32 Section 4 7 Site Log ...
Page 393: ......