Calibration
4-3
September 2004
Testing Output Linearity
1.
Press
[ESC]
,
[ENTER]
,
[ESC]
. The meter enters the user program.
2.
Press [
X
] until
CALIB
appears and press
[ENTER]
.
3.
Press [
X
] until
SLOT0
appears and press
[ENTER]
.
4.
Press [
X
] until
A
or
C
appears and press
[ENTER]
.
5.
Press [
X
] to select
Test
and press
[ENTER]
.
6.
Under
% Full Scale
enter
50.00
by using the arrow keys. Press
[
W
]
and [
X
] to move the cursor to desired location and press
[
S
]
and
[
T
]
to increase or decrease the number and press
[ENTER]
.
7.
Check the ammeter reading. Table 4-1 below lists the expected
ammeter readings at various % Full Scale settings, for both 4-20
mA and 0-20 mA scales. Refer to this table to verify the accuracy
of the ammeter readings taken above.
Note:
If the linearity test readings are not with 5
µ
A of the values
listed in Table 4-1, check the accuracy and wiring of the
ammeter. Then, repeat the low and high end calibrations. If
the analog output still does not pass the linearity test, contact
the factory for assistance.
8.
Repeat Step 2 but enter a different output (0-100%). Check the
ammeter reading at this setting and press
[ENTER]
when done.
Procedure Options
After completing the above steps, the meter returns to the
ANALOG
OUTPUT
window. Do one of the following:
•
To perform another programming function, refer to Appendix
A,
, to navigate to the desired menu.
•
To leave the
User Program
, press
[ESC]
three times.
Table 4-1: Expected Ammeter Readings
% Full Scale
4-20 mA Scale*
0-20 mA Scale*
0
4.000
0.000
10
5.600
2.000
20
7.200
4.000
30
8.800
6.000
40
10.400
8.000
50
12.000
10.000
60
13.600
12.000
70
15.200
14.000
80
16.800
16.000
90
18.400
18.000
100
20.000
20.000
* all ammeter readings should be ±0.005 mA
Summary of Contents for AquaTrans AT868
Page 8: ...Chapter 1 ...
Page 24: ...Chapter 2 ...
Page 60: ...Chapter 3 ...
Page 66: ...Chapter 4 ...
Page 72: ...Chapter 5 ...
Page 77: ...Chapter 6 ...
Page 88: ...Chapter 7 ...
Page 98: ...Chapter 8 ...
Page 106: ...Appendix A ...
Page 112: ...Appendix B ...
Page 113: ...CE Mark Compliance Introduction B 1 EMC Compliance B 1 LVD Compliance B 2 ...
Page 116: ...Appendix C ...
Page 117: ...Data Records Site Data C 1 ...
Page 122: ...Appendix D ...
Page 123: ...Measuring P and L Dimensions Measuring P and L D 1 ...
Page 126: ...Appendix E ...
Page 127: ...Service Record Introduction E 1 Data Entry E 1 Diagnostic Parameters E 3 ...
Page 131: ...Appendix F ...