8.3 QA Document Package Check List and Requirements
Table 8-1 is completed during the manufacturing process and QA inspection to ensure that
the all relevant operations are performed.
Table 8-1: Document Package Check List
Serial Number: _______________
Description
Initial
Date
Sample System Pressure Checked - System Heaters
Sample System Pressure Checked – Sample System
Purge System Checked
Aspirator Performance Tested
Gas Runs Complete (Calibration Data Sheet)
Temperature Sensor Inputs Checked and Calibrated
Analog Output Calibration Checked
Digital Output Checked
System 24VDC Supply Checked
Span Factor Set
Condenser Solenoid Function Checked
Zero Solenoid Function Checked
Control Cabinet Air Solenoid Function Checked
Operation of Cell Heaters Checked
Burn Oven for three (3) weeks
Cell Pressure Transducer Checked.
Dielectric Strength Test Certificate Completed
Matrix and Cal Documents Completed
Serial Numbers Recorded
Oven Lid Latches Adjusted and Locked
Summary of Contents for 943-TGS
Page 50: ...Revision 1 50 6 27 2017 Figure 4 14 Network Sub Panel ...
Page 94: ...Revision 1 94 6 27 2017 Figure 9 1 Mounting Detail ...
Page 95: ...Revision 1 95 6 27 2017 Figure 9 2 Oven Cabinet Detail ...
Page 96: ...Revision 1 96 6 27 2017 Figure 9 3 Control Cabinet Detail ...
Page 97: ...Revision 1 97 6 27 2017 Figure 9 4 Power Air Steam Requirements and Input Output Detail ...
Page 98: ...Revision 1 98 6 27 2017 Figure 9 5 Control Cabinet to Oven Cabinet Interconnect Detail ...
Page 99: ...Revision 1 99 6 27 2017 Figure 9 6 AC Wiring Detail ...
Page 100: ...Revision 1 100 6 27 2017 Figure 9 7 DC and Signal Wiring Detail ...
Page 101: ...Revision 1 101 6 27 2017 This page intentionally left blank ...