332
Upgrade and Maintenance Manual
CX2550/60/70 M4
GPGPU extension tray
10.4 Replacing the GPGPU in slot GPGPU 1
10.4.1 Preliminary steps
Perform the following procedures:
Ê
"Disabling the boot watchdog functionality of ServerView Operations
Manager" on page 73
Ê
Locate the desired server node with the ID button.
Ê
"Shutting down the server node" on page 50
Ê
If applicable, remove all external cables from the server node.
Ê
"Removing the server node from the server enclosure" on page 51
10.4.2 Removing the GPGPU
Ê
Remove the GPGPU, see section
"Removing the GPGPU extension from
.
Field Replaceable Unit
(FRU)
Hardware: 15 minutes
Tools:
Preliminary and concluding steps: tool-less
Main steps: PH2 / (+) No. 2 screw
Summary of Contents for PRIMERGY CX2550 M4
Page 6: ...6 Upgrade and Maintenance Manual CX2550 60 70 M4 ...
Page 20: ...Upgrade and Maintenance Manual CX2550 60 70 M4 Contents ...
Page 46: ...46 Upgrade and Maintenance Manual CX2550 60 70 M4 Important information ...
Page 70: ...70 Upgrade and Maintenance Manual CX2550 60 70 M4 Basic hardware procedures ...
Page 114: ...114 Upgrade and Maintenance Manual CX2550 60 70 M4 Expansion cards and OCP mezzanine cards ...
Page 182: ...182 Upgrade and Maintenance Manual CX2550 60 70 M4 Expansion cards and OCP mezzanine cards ...
Page 192: ...192 Upgrade and Maintenance Manual CX2550 60 70 M4 Main memory Figure 85 Memory dummy module ...
Page 204: ...204 Upgrade and Maintenance Manual CX2550 60 70 M4 Main memory ...
Page 320: ...320 Upgrade and Maintenance Manual CX2550 60 70 M4 System board and components ...
Page 356: ...356 Upgrade and Maintenance Manual CX2550 60 70 M4 GPGPU extension tray ...
Page 418: ...418 Upgrade and Maintenance Manual CX2550 60 70 M4 SXM2 extension tray ...
Page 454: ...454 Upgrade and Maintenance Manual CX2550 60 70 M4 Appendix ...