CX2550/60/70 M4
Upgrade and Maintenance Manual
75
Basic software procedures
5.1.3
Removing backup and optical disk media
Ê
Ask the system administrator to eject all remaining backup or optical media
from the backup or optical disk drive before removing it from the server.
Ê
If the backup media cannot be ejected by conventional means, and it is
mandatory that the cartridge be removed prior to returning the drive for
repair or disposing it, a manual tape extraction needs to be performed.
For more information on "forcible" tape ejection, see the "Tape Facts" pages
available to Fujitsu service partners from the following https address:
https://partners.ts.fujitsu.com/com/service/ps/Servers/PRIMERGY/Pages/
TapeFacts.aspx
For Japan:
Please contact Fujitsu support, if "forcible" tape ejection is necessary.
I
Fujitsu does not assume responsibility for any damage to the tape
drive, the data cartridge/tape or for the loss of any data resulting from
manual tape extraction procedures.
5.1.4
Verifying and configuring the backup software
solution
I
This task only applies to Japan.
Depending on the backup software solution, it may be necessary to disable or
delete the backup drive from the backup software drive list before starting the
maintenance task.
I
For more information on suitable backup software solutions and related
documentation, see the Fujitsu web pages.
5.1.5
Configuring LAN teaming
Use ServerView Operations Manager to obtain detailed information on existing
LAN teams:
Ê
In ServerView Operations Manager
Single System View
select
System Status
from the
Information / Operation
menu.
Ê
Under
Network Interfaces
select
LAN Teaming
.
Summary of Contents for PRIMERGY CX2550 M4
Page 6: ...6 Upgrade and Maintenance Manual CX2550 60 70 M4 ...
Page 20: ...Upgrade and Maintenance Manual CX2550 60 70 M4 Contents ...
Page 46: ...46 Upgrade and Maintenance Manual CX2550 60 70 M4 Important information ...
Page 70: ...70 Upgrade and Maintenance Manual CX2550 60 70 M4 Basic hardware procedures ...
Page 114: ...114 Upgrade and Maintenance Manual CX2550 60 70 M4 Expansion cards and OCP mezzanine cards ...
Page 182: ...182 Upgrade and Maintenance Manual CX2550 60 70 M4 Expansion cards and OCP mezzanine cards ...
Page 192: ...192 Upgrade and Maintenance Manual CX2550 60 70 M4 Main memory Figure 85 Memory dummy module ...
Page 204: ...204 Upgrade and Maintenance Manual CX2550 60 70 M4 Main memory ...
Page 320: ...320 Upgrade and Maintenance Manual CX2550 60 70 M4 System board and components ...
Page 356: ...356 Upgrade and Maintenance Manual CX2550 60 70 M4 GPGPU extension tray ...
Page 418: ...418 Upgrade and Maintenance Manual CX2550 60 70 M4 SXM2 extension tray ...
Page 454: ...454 Upgrade and Maintenance Manual CX2550 60 70 M4 Appendix ...