CX2550/60/70 M4
Upgrade and Maintenance Manual
203
Main memory
7.5.2.3
Concluding steps
I
Before powering on the server node connect the tubes to the tube
system of the rack, see the "RackCDU
TM
Service Manual".
Ê
"Installing the server node in the server enclosure" on page 67
Ê
If applicable, reconnect all external cables.
Ê
"Enabling replaced components in the BIOS" on page 89
Ê
"Controls and indicators on the server node" on page 448
Ê
"Verifying the memory mode" on page 90
(if applicable)
Summary of Contents for PRIMERGY CX2550 M4
Page 6: ...6 Upgrade and Maintenance Manual CX2550 60 70 M4 ...
Page 20: ...Upgrade and Maintenance Manual CX2550 60 70 M4 Contents ...
Page 46: ...46 Upgrade and Maintenance Manual CX2550 60 70 M4 Important information ...
Page 70: ...70 Upgrade and Maintenance Manual CX2550 60 70 M4 Basic hardware procedures ...
Page 114: ...114 Upgrade and Maintenance Manual CX2550 60 70 M4 Expansion cards and OCP mezzanine cards ...
Page 182: ...182 Upgrade and Maintenance Manual CX2550 60 70 M4 Expansion cards and OCP mezzanine cards ...
Page 192: ...192 Upgrade and Maintenance Manual CX2550 60 70 M4 Main memory Figure 85 Memory dummy module ...
Page 204: ...204 Upgrade and Maintenance Manual CX2550 60 70 M4 Main memory ...
Page 320: ...320 Upgrade and Maintenance Manual CX2550 60 70 M4 System board and components ...
Page 356: ...356 Upgrade and Maintenance Manual CX2550 60 70 M4 GPGPU extension tray ...
Page 418: ...418 Upgrade and Maintenance Manual CX2550 60 70 M4 SXM2 extension tray ...
Page 454: ...454 Upgrade and Maintenance Manual CX2550 60 70 M4 Appendix ...