30
Step 12 continued: Set Rebar
arrangement for top slab.
Pour fresh concrete
Cure concrete until
hardened.
Step 12 continued : During final landscaping, seeding etc., be sure to pitch final
grade away from covers to sweep surface water away from treatment tank.
Step 13: Fill out Warranty Activation Card (received with this Installation Manual) and return to
Fuji Clean USA to activate system Warranty. If this card cannot be found, please contact Fuji
Clean USA for voice or online Warranty activation. 207-406-2927.
Step 12 continued : Reference information access cover for H-20, HS-20
Bolt lock type
Must have holes to move access cover