Step 7: Using supplied adaptors and fittings, attach air pipe fitting to tank and connect to ¾” or 1”
conduit in prepared trench (min. 6” deep) to location of air blower
.
Please note: ¾” or 1” flexible
irrigation line, 100 PSI Max, (or equivalent) may also be used for the air line.
12
3/4” PVC air line can insert directly
into commercial tank models, CE21
and larger and CEN14 and larger.
Step 7 continued: Set riser on the tank.
Maximum riser height is 24-inches.
CE14/CEN10
FujiMAC 150RII
CE21/CEN14
FujiMAC 200RII
CE30/CEN21
FujiMAC 150RII (2)
Blower Outlet Pipe
3/4”
Air Intake at Tank
φ13
※
φ20
※
φ20
※
Blower to Tank Distance /
Airline Conduit Dia.
<33 Feet /
3/4”
<100 Feet/
1”
< 33 Feet
3/4”
<100 Feet
1”
<33 Feet
1”
<100 Feet
1”
For connection air line to tank, use sealant
meeting ASTM C990-96 standard to prevent
septic gas transmission into control panel.
(Note: Adaptors to tank are not necessary for air line to tank connection for Fuji Clean models, CE21 and
larger and CEN14 and larger. Use 3/4” conduit). Adaptors to tank are necessary for air line to tank
connection for CE14 and CEN10.
LOCATE BLOWER WITHIN 33-FT OR 100-FT OF TREATMENT TANK (FOLLOW CONDUIT ON TABLE BELOW)
AND WITH NO MORE THAN FIVE (5) ELBOWS (FOLLOW BLOWER FOUNDATION DRAWING BELOW). If site
conditions prevent this, please contact your distributor or Fuji Clean USA for technical assistance.
※
Japanese pipe dia.
Excluding
in “5 Elbows”