27
EN
Welding technology aspects
Welding technol-
ogy aspects
Shielding gas
ArO
2
... for unalloyed and low-alloy steels
Gas flow
total gas flow rate approx. 15 - 20 l/min
TPS 5000 welding characteristics (database 02-0043)
* ... Recommended by Fronius for the laser-twin welding process
L ... Lead wire electrode
T ... Trail wire electrode
Earth connection
Use a separate grounding (earthing) cable for each power source:
Separate grounding (earthing) cable
Shared grounding (earthing) cable, earth socket
Grounding (earthing) cable laid in a loop
Grounding (earthing) cable coiled
Welding circuit
inductivity L,
welding circuit re-
sistance r
IMPORTANT!
The welding circuit inductivity L and the welding circuit resistance r must be
calibrated separately for each power source and for each twin welding process.
Material
Gas
1.2 (L)
1.0 (T)
G3Si1-Twin
M22 - 96% Ar, rest O
2
02-1922
02-1919
*
G3Si1-Twin
M22 - 96% Ar, rest O
2
02-1921
02-1918
*
G3Si1-Twin
M21 - 90% Ar, rest O
2
02-1920
02-1917
Summary of Contents for LaserHybrid Ultracompact Twin
Page 2: ...2...
Page 4: ...4...
Page 8: ...8...
Page 18: ...18...
Page 19: ...General information...
Page 20: ......
Page 34: ...34...
Page 35: ...Control elements and connections...
Page 36: ......
Page 41: ...Start up...
Page 42: ......
Page 76: ...76...
Page 77: ...Maintenance...
Page 78: ......
Page 94: ...94 3 Position the gas nozzle and secure using a 2 5 mm Al len key Tightening torque 1 Nm 5...
Page 96: ...96 Fit the spatter guard plate using two Al len screws 3 mm 2 2 2...
Page 110: ...110...
Page 111: ...Appendix...
Page 112: ......
Page 114: ...114 Spare parts list LaserHybrid Ultracompact Twin...
Page 115: ...115...
Page 116: ...116...
Page 118: ...118...
Page 119: ...119...