❒ Insert the dosing screw into the trough on the boiler room side
❒ Grease the square shaft of the mitre gear well and put the screw on
❒ Align the troughs in a row, and adjust with the adjustable feet if necessary
Fit the adjustable feet to the floor:
❒ Make 1 hole in the floor on the left and right for each of the adjustable feet
❒ Drill the holes marked
- Drill diameter 15 mm
- Min. drill depth 105 mm
❒ Insert the heavy load anchors into the bore holes and tighten with a spanner (SW
17 mm)
4
Assembly
Assembling the torsion arm agitator
24
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com