Table of Contents
Qualification of assembly staff
Personal protective equipment for assembly staff
Qualification of operating staff
Protective equipment for operating staff
Requirements at the installation site
Information about the fuel store
Assembling the torsion arm agitator
Assembling the gears and feeder trough
Fitting the upper part of gravity shaft and drive unit
Assembly with screw Ø150 / Ø200
Setting the tension of the torsion springs
Fitting adjustable feet in boiler room (optional)
Connecting the sprinkler system
Table of Contents
2
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com