4.3 Assembling the torsion arm agitator
4.3.1 Materials supplied
18b
1
Armset
2
Top part of gravity shaft
3
Torque support
4
Geared motor
5
Feed screw
6
Trough cover - wood chips
(standard)
7
Trough cover - pellets (optional)
8
Raising plate for discharge without
raised floor
9
Trough open (store side)
10
Transfer channel
11
Trough closed (boiler room side)
12
Stir plate
13
Intermediate plate
13a
2x Cover plates (TGR 150-200 only)
14
Support, boiler room (optional)
15
Adjustable feet
15a
Shorter adjustable feet
(optional for horizontal installation)
16
Gear supports
16a
Shorter gear supports
(optional for horizontal installation)
17
Extensions for gear supports
(optional)
18
Mitre gear
18a
Spacer for agitator head (TGR 150
only)
18b
Spacer for agitator head (TGR 200
only)
19
Accessories kit
Assembly
4
Assembling the torsion arm agitator
Installation Instructions TGR 110/150/200 | M1390116_en
19