FPI P36D-1 Zero Clearance Direct Vent Gas Fireplace
63
PALACE™ SERIES OPTIONS
THE BALMORAL
®
FRONT INSTALLATION
6)
For optional fan installation, see "Optional Fan Installation" section.
7)
For 2-panel & 3-panel door installation, see "2-Panel Door Installation
& 3-Panel Door Installation" sections.
1)
Bend tabs located at the back of the Balmoral Front upwards 90
degrees.
B e n d t a b
upwards 90
degrees.
Backside of Front shown.
2)
Secure the bottom frame of the Front by loosening the inner screw
on the hinge brackets on both the left and right side of the fi rebox.
Slide frame in place and secure.
Left Side Shown
Hinge bracket on
bottom of fi rebox
4)
Remove existing control switch box from under fi rebox by disconnecting
wires connected to the valve at TH-TH/TP terminals and discard.
Wires connected to Valve.
Control Box
3)
Slide tabs into louver brackets located on the inside top of the
fi rebox.
Tabs
Bracket inside
top of fi rebox.
Balmoral Front
frame
5)
Connect the ON/OFF switch wires coming from the left side of the
Front to the valve, with black hooked up to the TH/TP terminal and
red hooked up to the TH terminal.
NOTE:
If fan option is not used please see step (5) of optional fan
installation for placement of fan control box.
Valve
ON/OFF Switch
Wires
Fan Control Box
Summary of Contents for Regency P36D-LP1
Page 7: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 7 INSTALLATION UNIT DIMENSIONS...
Page 50: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 50 FLUSH BAY DOOR OPTIONS...
Page 57: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 57 CAST FACEPLATE...
Page 66: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 66 REPLACEMENT PARTS LIST...