background image

FPI P36D-1 Zero Clearance Direct Vent Gas Fireplace

8

INSTALLATION

IMPORTANT MESSAGE 

SAVE THESE 

INSTRUCTIONS

The P36D-NG1 or P36D-LP1 Direct Vent 
Fireplace must be installed in accordance 
with these instructions. Carefully read all the 
instructions in this manual fi rst. Consult the 
"authority having jurisdiction" to determine the 
need for a permit prior to starting the installation. 
It is the responsibility of the installer to ensure 
this fi replace is installed in compliance with 
manufacturer's instructions and all applicable 
codes.

BEFORE YOU START

Safe installation and operation of this appliance 
requires common sense, however, we are 
required by the Canadian Safety Standards 
and ANSI Standards to make you aware of 
the following:

GENERAL SAFETY 

INFORMATION

1)

  The appliance installation must conform 

with local codes or, in the absence of local 
codes, with the current Canadian or National 
Gas Codes, CAN1-B149 or ANSI Z223.1 
Installation Codes.

2)

  The appliance when installed, must be 

electrically grounded in accordance with 
local codes, or in the absence of local codes 
with the current National Electrical Code, 
ANSI/NFPA 70 or CSA C22.1 Canadian 
Electrical Code.

3)

  See general construction and assembly 

instructions. The appliance and vent should 
be enclosed.

4)

  This appliance must be connected to the 

specifi ed vent and termination cap to the 
outside of the building envelope. Never vent 
to another room or inside a building. Make 
sure that the vent is fi tted as per Venting 
instructions.

5)

  Inspect the venting system annually for 

blockage and any signs of deterioration.   

6)

  Venting terminals shall not be recessed into 

a wall or siding.

7)

  Any safety glass removed for servicing 

must be replaced prior to operating the 
appliance.

8)

  To prevent injury, do not allow anyone who 

is unfamiliar with the operation to use the 
fi replace.

9)

  Wear gloves and safety glasses for protection 

while doing required maintenance.

10)

 Be aware of electrical wiring locations in 

walls and ceilings when cutting holes for 
termination.

11)

 Under no circumstances should this 

appliance be modifi ed. Parts that have to be 
removed for servicing should be replaced 
prior to operating this appliance.

12)

  Installation and any repairs to this appliance 

should be done by a qualifi ed service person. 
A professional service person should be 
called to inspect this appliance annually. 
Make it a practice to have all of your gas 
appliances checked annually.

13)

 Do not slam shut or strike the glass door.

INSTALLATION AND REPAIR SHOULD 
BE DONE BY A QUALIFIED SERVICE 
PERSON. THE APPLIANCE SHOULD 
BE INSPECTED BEFORE USE 
AND AT LEAST ANNUALLY BY A 
PROFESSIONAL SERVICE PERSON. 
MORE FREQUENT CLEANING MAY 
BE REQUIRED DUE TO EXCESSIVE 
LINT FROM CARPETING, BEDDING 
MATERIAL, ETC. IT IS IMPERATIVE 
THAT CONTROL COMPARTMENTS, 
BURNERS AND CIRCULATING AIR 
PASSAGEWAYS OF THE APPLIANCE 
BE KEPT CLEAN.

CLOTHING OR OTHER FLAMMABLE 
MATERIAL SHOULD NOT BE PLACED 
ON OR NEAR THE APPLIANCE.   

14)

 Under no circumstances should any solid 

fuels (wood, paper, cardboard, coal, etc.) 
be used in this appliance.

15)

 The appliance area must be kept clear and 

free of combustible materials, (gases and 
other fl ammable vapours and liquids).

Emissions from burning  wood or gas could 
contain chemicals known to the State of 
California to  cause cancer, birth defects or 
other reproductive harm.

INSTALLATION  

CHECKLIST

    

1) 

Locate appliance

 

a)  Room location (Refer to "Locating Your 

Gas fi replace" section)

 

b)  Clearances to Combustibles (Refer to 

"Clearances" section)

 

c)  M a n t l e   C l e a r a n c e s   ( R e f e r   t o 

"Combustible Mantel Clearances" 
section)

 d) 

Framing 

Finishing 

Requirements 

(Refer to "Framing & Finishing" 
section)

 e) 

Venting 

Requirements 

(Refer 

to 

"Venting" section)

2) 

Assemble Top Standoffs and Top Facing 
Support and Side Nailing Strips (Refer 
to "Unit  Assembly Prior to Installation" 
Section).  NOTE: Must be done before 
installing unit into place.

3) 

Install vent (Refer to "Venting" sections).

4)

  Make gas and electrical connections. Test 

the pilot. Must be as per diagram (Refer to 
"Pilot Adjustment " section).  

 

Convert to propane if desired (Refer to "Gas 
Line Installation" and "Conversion Kit from 
NG to LPG" sections).

5)

  Install standard and optional features.  Refer 

to the following sections: 

 
 

a. Optional Brick Panels

 

b. Log Set Installation

 

c. Standard Flush Door

 d. 

Regency

®

 Flush or Bay Fronts

 e. 

Hampton

®

 Cast Faceplate 

 

f.  Palace™ Series Options

 g. 

Remote 

Control 

(Optional)

 h. 

Wall 

Switch 

(Optional)

 i. 

 

Wall 

Thermostat 

(Optional)

 

j.  Optional Fan Installation 

 

  

6)

 Final 

check.

DUE TO HIGH TEMPERATURES, THE 
APPLIANCE SHOULD BE LOCATED 
OUT OF TRAFFIC AND AWAY FROM 
FURNITURE AND DRAPERIES.

WARNING: FAILURE TO INSTALL THIS 
APPLIANCE CORRECTLY WILL VOID 
YOUR WARRANTY AND MAY CAUSE 
A SERIOUS HOUSE FIRE.

CHILDREN AND ADULTS SHOULD 
BE ALERTED TO THE HAZARDS OF 
HIGH SURFACE TEMPERATURES, 
ESPECIALLY THE FIREPLACE GLASS, 
AND SHOULD STAY AWAY TO AVOID 
BURNS OR CLOTHING IGNITION.  

YOUNG CHILDREN SHOULD BE 
CAREFULLY  SUPERVISED WHEN 
THEY ARE IN THE SAME ROOM AS 
THE APPLIANCE.

Summary of Contents for Regency P36D-LP1

Page 1: ...followed exactly a re or explosion may result causing property damage personal injury or loss of life FOR YOUR SAFETY Do not store or use gasoline or other ammable vapors and liquids in the vicinity...

Page 2: ...llation instructions and the Manufactured Home Construction and Safety Standard Title 24 CFR Part 3280 or the current Standard of Fire Safety Criteria for Manufactured Home Installations Sites and Com...

Page 3: ...41 Remote Control Optional 42 Wall Switch Optional 42 Wall Thermostat Optional 42 Wiring Diagrams 43 Optional Fan Installation 45 Optional Fan Removal 45 SAFETY LABEL Copy of Safety Decal 5 REQUIREMEN...

Page 4: ...cement 48 Removing Valve 49 Installing Valve 49 REGENCY OPTIONS Flush Trim 51 Flush Louvers 51 Double Screen Door 51 Bay Door 52 Bay Trim 52 Bay Louvers 52 Full Screen Door Installation 53 Tripoli Arc...

Page 5: ...e the label on the unit is the correct one SAFETY LABEL COPY OF SAFETY DECAL FOR P36D 1 For the State of Massachusetts installation and repair must be done by a plumber or gas tter licensed in the Com...

Page 6: ...e directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VEN...

Page 7: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 7 INSTALLATION UNIT DIMENSIONS...

Page 8: ...o have all of your gas appliances checked annually 13 Do not slam shut or strike the glass door INSTALLATIONANDREPAIRSHOULD BE DONE BY A QUALIFIED SERVICE PERSON THE APPLIANCE SHOULD BE INSPECTED BEFO...

Page 9: ...llationswhenusedwithaListedMillivolt Thermostat Some areas may have further requirements check local codes before installation 6 The P36D 1 Direct Vent Gas Fireplace is approvedforalcoveinstallations...

Page 10: ...Clearances Bay or Flush Front 6 152mm Barcelona Front 6 152mm Hampton Cast Faceplate 6 152mm Kensington Front 6 152mm Balmoral Westminster Front 6 152mm Measured from Surround or Front See Regency Cl...

Page 11: ...INSTALLATION Clearances for Bay or Flush Front Clearances for Barcelona Front REGENCY CLEARANCES PALACE SERIES CLEARANCES Clearances for The Balmoral The Westminster Front Clearances for The Kensingto...

Page 12: ...NTEL CLEARANCES These drawings are to scale at 1 6 one inch 6 inches Mantel can be installed anywhere in shaded area or higher using the above scale Note Ensure the paint that is used on the mantel an...

Page 13: ...t are shown in the diagram below Note A non combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non combustible board These drawings are to scale...

Page 14: ...ing is heat resistant or the paint may discolour HAMPTON COMBUSTIBLE MANTEL CLEARANCES Mantel Clearances with Hampton Cast Faceplate 7 Because of the extreme heat this replace emits the mantel clearan...

Page 15: ...on the mantel and the facing is heat resistant or the paint may discolour PALACE COMBUSTIBLE MANTEL CLEARANCES Because of the extreme heat this replace emits the mantel clearances are critical Combust...

Page 16: ...l leg clearances as per diagram Maximum 1 1 2 projection at 2 minimum clearance PALACE SERIES MANTEL LEG CLEARANCES Combustible mantel leg clearances as per diagram Maximum 1 1 2 projection at 2 minim...

Page 17: ...de Nailing Strips Top Facing Support and Top Standoffs before unit is slipped into position See Unit Assembly Prior to Installation section for assembly details 2 Frame in the enclosure for the unit w...

Page 18: ...g the optional Barcelona Front or Palace Series a non combustible material 12 305mm above the unit and 6 153mm on each side must be used See diagram 1 The Barcelona Front and Palace Series also requir...

Page 19: ...ptional Tripoli Arch Door a non combustible material 12 305mm above the unit and 6 153mm on each side must be used See diagram 2 The Tripoli Arch Door also requires steel stud framing above and on eac...

Page 20: ...or C depending on your facing depth VENTING INTRODUCTION The P36D 1 uses the balanced ue technology Co Axial system The inner liner ventsproductsofcombustiontotheoutsidewhile the outer liner draws ou...

Page 21: ...bove a meter regulator assembly within 3 90cm horizontally from the centerline of the regulator J Clearance to service regulator vent outlet min 36 90cm K Clearance to non mechanical air supply inlet...

Page 22: ...eet 1 6 7 8 dia exible liner 4 ft length 2 4 dia exible liner 4 ft length 3 spring spacers 4 4 thimble 2 5 AstroCap termination cap 1 6 screws 12 7 tube of Mill Pac 1 8 plated screws 8 9 screws 8 x 1...

Page 23: ...DT EL45 4D45L 45O Elbow Black 945B 4DT EL45B 4D45LB 45O Elbow Swivel Galvinized 945G N A N A 45O Elbow Swivel Black 945BG N A N A 90O Elbow Galvinized 990 4DT EL90S 4D90LS 90O Elbow Black 990B 4DT EL9...

Page 24: ...PI AstroCapTM and FPI Riser Vent terminal are certi ed for installations using FPI venting systems as well as Simpson Dura Vent Direct Vent GS American Metal Products Security Secure Vent AmeriVent Di...

Page 25: ...6 7 8 inner diameter Maintain clearances to combustibles Horizontal vent must be supported every 3 feet Firestops are required at each oor level and whenever passing through a wall NOTE If you are ins...

Page 26: ...learances to combustibles Note Must use optional rigid pipe adaptor when using rigid vent systems Part 510 994 VENTING ARRANGEMENTS VERTICAL TERMINATION RIGID PIPE SYSTEM Propane Natural Gas The shade...

Page 27: ...he shaded area in the diagram 1 shows all allowable combinations of straight vertical and offset to vertical terminations with rigid pipe vent systems for Propane and Natural Gas Maximum two 45o elbow...

Page 28: ...Please note minimum 1 foot between 90o elbows is required One 90o elbow Two 45o elbows Lengths do not include elbow indicated Option V H V V1 H H1 A 0 Min 1 Max 1 Min 2 Max B 1 Min 2 Max 3 Min 3 Max...

Page 29: ...tical and max 8 feet total horizontal Please note min 1 foot between 90o elbows is required One 90o elbow Two 45o elbows Lengths do not include elbow indicated Option V H H1 V V1 A 0 Min 2 Max 2 Min B...

Page 30: ...collar of the termination cap Required Parts Part Description 946 529 Co linear DV Vertical Termination Cap 948 305 3 Flex 35 ft 946 563 Co Axial to Co Linear Adapter Kit which contains the following...

Page 31: ...ING ARRANGEMENT VERTICAL TERMINATIONS CO LINEAR FLEX SYSTEM INTO MASONRY FIREPLACES FOR BOTH RESIDENTIAL MANUFACTURED HOMES The shaded area in the diagrams show the allowable vertical terminations 8 M...

Page 32: ...rindentations located on the female ends of pipes and ttings are designed to slide straight onto the male ends of adjacent pipes and ttings by orienting the four pipe indentations so they match and sl...

Page 33: ...l hole at his point Next drop a plumb bob from the roof to the hole previously drilledintheceiling andmarkthespotwhere the vent will penetrate the roof Determine if ceilingjoists roofraftersorotherfra...

Page 34: ...LEX INSTALLATION PROCEDURES 1 Locate the unit in the framing rough in the gas preferably on the right side of the unit and the electrical Junction block is on the left side on the left Locate the cent...

Page 35: ...ern will have small probably yellow ames not coming into proper contact with the rear burner or thermopile or thermocouple alwaysbesttoconsultwithyourlocalauthorities and the CAN CGA B149 installation...

Page 36: ...Instruction Sheet 5 Remove the 2 screws holding the Burner Assembly to the firebox base Push the Burner Assembly to the left and lift out DC Sparker Kit Contains Qty Part Description 1 820 475 Bracket...

Page 37: ...unting bracket 23 Disconnect the ignitor wire from the Piezo Ignitor and connect it to the DC Sparker Piezo Ignitor Ignitor Wire Piezo Ignitor Ignitor Wire DC Sparker 24 Install the 3 4 nylon plug to...

Page 38: ...ontrol 39 Check for proper flame appearance and glow on logs NOTE The battery in the DC Sparker Box will need to be replaced an nually 25 Connect the DC spark generator wires to the SIT Valve with the...

Page 39: ...tional Brick Panels install the Brick Panels prior to installing the logs 1 Carefully remove the logs from the box and unwrap them The logs are fragile handle with care do not force into position 2 Sp...

Page 40: ...ar grate tab 02 50 02 55 02 75 0 2 5 3 02 51 02 54 02 Front Brackets 02 50 02 53 Notch 02 50 02 55 02 53 9 Sit Log 02 50 on the front left side of the burner Push the back of the log against the 2 fro...

Page 41: ...ard ush door comes with a black frame To install the frame simply hook the top door ange onto the top of the unit and swing the door towards the unit see diagram 1 Be careful that the glass gasket doe...

Page 42: ...e control kit comes with a hand held transmitter a receiver and a wall mounting plate 1 Choose a convenient location on the wall to install the receiver and the receptacle box protection from extreme...

Page 43: ...acle box provided with the unit in case the fan is installed at a later date CAUTION Label all wires prior to disconnection when servic ing controls Wiring errors can cause improper and dangerous INST...

Page 44: ...1 Zero Clearance Direct Vent Gas Fireplace 44 For PROPANE Units and Units Equipped with DC Spark Boxes For installation of the DC Spark Box refer to the LP Conversion instructions in this manual INST...

Page 45: ...thecontrolbox Ensure that there is no interference with the wires when the louver is closed and that no wire will touch the hot metal surfaces or sharp edges 13 Plug the fan power cord into the rear e...

Page 46: ...ing process The glass should be cleaned or the lm will bake on and become very dif cult to remove Use a non abrasive cleaner and NEVER clean the glass while it is hot AERATION ADJUSTMENT The air shutt...

Page 47: ...e burnertube s andlogsandismadeofadifferent gauge material from the rest of the rebox and body Therefore thevaryingthicknessesofsteel will expand and contract at slightly different rates which can cau...

Page 48: ...sition of these logs must be as shown in the diagrams under Log Installation Note Improper positioning of logs may create carbon build up and will severely alter the unit s performance which is not co...

Page 49: ...rformance 9 Reinstall the 10 hold down screws 10 Hook up the 2 TP and 2 TH wires to the appropriate connections on the valve 11 Reinstall the bottom brick panel and the front log stand 12 Install Burn...

Page 50: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 50 FLUSH BAY DOOR OPTIONS...

Page 51: ...side of the bottom louver Push down to lock into place Tighten the screws Burner ON OFF control box attached to bottom ush louver Screws on louver bracket Burner ON OFF control box FLUSH TRIM Attach...

Page 52: ...Slide the Bay De ector into the 2 Bay De ector brackets in the top of the unit 2 Hook the top of the bay door over the ush door ange and swing the bottom against the bottom ange of the ush door 3 Sec...

Page 53: ...ner cut outs to secure the base of the Frame using the 2 x Hex Head Drill Point Screws provided Backside of Full Screen Door Frame Shown Inside Top of Outer Frame Hinge Bracket Inner Hinge Bracket Scr...

Page 54: ...all the Left and Right Side Screen Doors in the fully open position by placing over top of the hinges on the Full Screen Door Frame NOTE Failure to install the doors in the fully open position could r...

Page 55: ...The facing material has to go on after the unit is set 1 Remove Glass Door 2 Remove 2 screws and bracket as indicated refer to Diagram 2 3 Install On Off switch refer to Diagram 3 Diagram 2 Diagram 3...

Page 56: ...with the corresponding hole on the Top Support Frame then secure with 1 screw b Repeat step on the other side 10 Change Logo Replace existing logo with Regency logo a Mount Side Support Frame to unit...

Page 57: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 57 CAST FACEPLATE...

Page 58: ...of faceplate with screw 4 Repeat step 3 for the right side faceplate Secure bottom of faceplate with screw 5 Slide top piece of faceplate into side faceplates by tting mounting plates into brackets 6...

Page 59: ...oved in step 3 5 Install hinge to bracket then secure with screw New hinge bracket Left side shown 6 Place something underneath bottom grill to prevent scratching 7 Line up hinge holes in bottom grill...

Page 60: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 60 The Westminster Front The Kensington Front The Balmoral Front...

Page 61: ...racket inside top of rebox Kensington Front frame 4 Removeexistingcontrolswitchboxfromunder reboxbydisconnecting wires connected to the valve at TH TH TP terminals and discard Wires connected to Valve...

Page 62: ...he inner screw on the hinge brackets on both the left and right side of the rebox Slide frame in place and secure Left Side Shown Hinge bracket on bottom of rebox 4 Slide tabs into louver brackets loc...

Page 63: ...right side of the rebox Slide frame in place and secure Left Side Shown Hinge bracket on bottom of rebox 4 Removeexistingcontrolswitchboxfromunder reboxbydisconnecting wires connected to the valve at...

Page 64: ...over 3 Connect new fan control box wires to the existing fan plug wires red to red black to black Disconnect Wires Fan Control Box Fan Control Box Vertical Hinge Bracket Discard Fan Cover with Wires N...

Page 65: ...ews 1 Install sub frame by hooking top over glass door push in bottom of frame and secure with 2 screws Sub Frame 2 Mount 2 panel door frame to ange on sub frame ensuring to line up holes Secure using...

Page 66: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 66 REPLACEMENT PARTS LIST...

Page 67: ...ON OFF 3 way 910 899 Wire Harness Valve to Burner 432 917 Fan Speed Control Assy 120 Volts Optional 42 910 331 P Fan Motor 432 966 Fan Switch Assy 120 Volts Optional 43 910 813 Power Cord 120 Volts 4...

Page 68: ...lve Tray NG LP 57 910 478 Valve S I T Natural Gas Propane 58 Valve Bracket 65 Pilot Bracket 66 910 038 Pilot Assy S I T 3 Flame NG 910 039 Pilot Assy S I T 3 Flame LP 67 Pilot Holder 68 W840470 Pilot...

Page 69: ...Red 780 938 Bay Front Trim Set Brass 780 936 Bay Front Trim Set Steel 112 Bay Front Trim Top Bottom 780 934 Bay Front Trim Set Gold 113 Bay Front Trim Gold Bottom 114 Bay Front Trim Gold Top 510 988 B...

Page 70: ...923 Flush Louvers Set Steel Black 138 Flush Louver Assy Top 139 Flush Louver Assy Btm 146 Barcelona Assy Black 148 Barcelona Louver Assy Black 510 934 Flush Glass Trim Set Brass 510 947 Flush Glass Tr...

Page 71: ...LY Part Description 513 971 Cast Faceplate Set 201 Cast Faceplate Right 202 Cast Faceplate Top 203 Cast Faceplate Left 513 981 Cast Grills Set 204 Top Grill 205 Bottom Grill Not available as a replace...

Page 72: ...__________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ _________________...

Page 73: ...__________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ _________________...

Page 74: ...__________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ _________________...

Page 75: ...nd inspected by an authorized dealer within three days of installation Reported damage after this time will be subject to rejection It is the general practice of FPI to charge for larger higher priced...

Page 76: ...n Panorama Palace AstroCap Kensington Westminster Balmoral Tripoli HeatWave and Heat Release are trademarks of FPI Fireplace Products International Ltd FPI replaces are designed with reliability and s...

Reviews: