FPI P36D-1 Zero Clearance Direct Vent Gas Fireplace
29
V
H1
H
V1
INSTALLATION
VERTICAL VENTING WITH TWO (2) 90
O
ELBOWS
VERTICAL VENTING WITH THREE (3) 90
O
ELBOWS
V1
V
H
Option V
H
V + V1
A)
0' Min. 2' Max. 1' Min.
B)
1' Min. 4' Max. 3' Min.
C)
2' Min. 5' Max. 4' Min.
D)
3' Min. 6' Max. 5' Min.
E)
4' Min. 7' Max. 6' Min.
F)
5' Min. 8' Max. 7' Min.
With these options, max. total
pipe length is 30 feet with min.
of 7 feet total vertical and max.
8 feet total horizontal.
Please note min. 1 foot
between 90
o
elbows is
required.
One 90
o
elbow = Two 45
o
elbows.
Lengths do not include elbow indicated.
Option V
H + H1 V + V1
A)
0' Min. 2' Max. 2' Min.
B)
1' Min. 2' Max. 3' Min.
C)
2' Min. 3' Max. 4' Min.
D)
3' Min. 4' Max. 6' Min.
E)
4' Min. 5' Max. 7' Min.
F)
5' Min. 6' Max. 8' Min.
G)
6' Min. 7' Max. 9' Min.
H)
7' Min. 8' Max. 10' Min.
With these options, max.
total pipe length is 30 feet
with min. of 10 feet total
vertical and max. 8 feet
total horizontal.
Please note min. 1 foot
between 90
o
elbows is
required.
One 90
o
elbow = Two 45
o
elbows.
Lengths do not include elbow indicated.
Summary of Contents for Regency P36D-LP1
Page 7: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 7 INSTALLATION UNIT DIMENSIONS...
Page 50: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 50 FLUSH BAY DOOR OPTIONS...
Page 57: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 57 CAST FACEPLATE...
Page 66: ...FPI P36D 1 Zero Clearance Direct Vent Gas Fireplace 66 REPLACEMENT PARTS LIST...