ISSUE
: 21/09/03
FD 6100 MAINTENANCE
MANUAL
REVISION
: 2.1
SECTION
: 01
PAGE 21
CONTENTS
2
SERVICE CALL CHECK LISTS
2.1
START OF SERVICE CALL CHECK LIST
Check the user has been trained on the machine.
Check the application corresponds with the job in process.
Check the properties of the job correspond to the machine specifications.
What is the total number of cycles?
What is the rate of clogging up of the machine (does the user apply the recommended cleaning procedures?).
2.2
END OF SERVICE CALL CHECK LIST
Clean the transportation and folding rollers.
Inform the user about the origin of the fault and show how to avoid it in the future.
Test the job in process (process at least thirty documents).
Rinse the wetting brushes under warm water.
Check the moistening quality.
Check the water level in the tank.