2
TABLE OF CONTENTS (continued)
Equipment Setup……………………………………………………...…..……….……..….46
Installing the Door Assembly.........................................…………………….......…46
Right Side Door Assembly Installation.........................................………...46
Left Side Door Assembly Installation.................….……………………...…47
Installing the Cup Holder Arm Support..……………………….………...…………..48
Connecting the Draw Switch ..………………………………….………...…………..49
Right Side Switch Connection......................................................………...49
Left Side Switch Jack Installation.......................….……………………...…49
Installing the Tube and Cable Rail……………………………….…...…………...…50
Right
Side
Rail
Installation...........................................................………...50
Left Side Rail Installation...................................….……………………...…51
Aligning and Adjusting the Cup Holder....……………………….…....……...…...…52
Connecting the Auto Draw Lift and Closing the Door Assembly......…………...…53
Connecting the Sanitizer Tank.............................................……….…………...…54
Power Connections and Power Up……………………………………….…........…55
Installing the Syrups....................................………………………...……….…...…56
Touch Panel Setup..................…….………………..…………………………....……...…58
Accessing the Maintenance Menu..............………………………...……….…...…58
Equipment Setup Wizard............................………………………...……….…...…58
Time and Date Settings................................................................………...58
Cup
Bounce
Sensitivity......................................….……………………...…60
Driver
Board
Setting..........................................….……………………...…60
Change
Switch
Input....................................................................………...61
Enable Weight Sensor / Enable Auto-Dispense Lift……………………...…61
Priming the Syrups......................………..…….……………………..…...….....…...61
Calibrating the System..................……………………………….…...…………...…62
Weight
Sensor
Calibration...........................................................………...62
Syrup / Syrups Calibration.................................….……………………...…62
Ice
Cream
Dispense
Calibration........................….……………………...…64
Contact and System Info.............................………………………...……….…...…68
Other Touch Panel Features.......………..…….……………………..…...….....…...69
Drawing a Serving...................…….………………..…………………………....……...…70
Dispense Both Ice Cream and Syrup............................…..……...…….………….70
Dispense Ice Cream Only...........………..…….……………………..…...….....…...70
Dispense Syrup Only..................………..…….……………………..…...….....…...71
Recommended Maintenance Items Replacement Schedule………………....…....…73
Ordering/Service Information…………….…….…...…………………..……….........…..74
Summary of Contents for CTP 80SNS-L
Page 7: ...6 PAGE INTENTIONALLY LEFT BLANK...
Page 9: ...8 General System Overview Figure 1...
Page 14: ...13 PAGE INTENTIONALLY LEFT BLANK...
Page 15: ...14 Door Facade Assembly Exterior Features Figure 3A...
Page 19: ...18 Door Facade Assembly Interior Features Figure 3B...
Page 21: ...20 Syrup Pump and Related Parts Figure 4...
Page 25: ...24 Electronic Parts and Connections Figure 6...
Page 26: ...25 PAGE INTENTIONALLY LEFT BLANK...
Page 28: ...27 PAGE INTENTIONALLY LEFT BLANK...
Page 32: ...31 PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...35 PAGE INTENTIONALLY LEFT BLANK...
Page 46: ...45 PAGE INTENTIONALLY LEFT BLANK...
Page 58: ...57 PAGE INTENTIONALLY LEFT BLANK...