FISCHBEIN
®
Co. MODEL PBC-6000™
OPERATOR’S MANUAL
REV. D 2005-03
35
6.
Push in on the belt between the takeup roller and the drive sprocket. If the tension in the belt
is correct, the belt should deflect about ½ to ¾ inch (13 – 19mm). (
Illustration 8.10
)
7.
Install the swing channel shrouding, if it was removed.
8. Turn “ON” the pneumatic and electrical supplies to the PBC and turn the motor enable
switch to the “AUTO” position. Push the “START” button and then the “CLOSE” buttons
until the swing channel stays in the down position.
Illustration 8.11
Illustration 8.12
Summary of Contents for PBC-6000
Page 69: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 72 this page left blank...
Page 71: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 75 this page left blank...
Page 73: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 78 this page left blank...
Page 75: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 81 this page left blank...
Page 77: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 84 this page left blank...
Page 79: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 87 this page left blank...
Page 81: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 90 this page left blank...