![background image](http://html1.mh-extra.com/html/fischbein/pbc-6000/pbc-6000_operators-manual_2294110053.webp)
FISCHBEIN
®
Co. MODEL PBC-6000™
OPERATOR’S MANUAL
REV. D 2005-03
53
to take some measurements or make some marks on the carry through plate before removing
the manifold.
4. Open the rear main electrical control panel and locate the lead wires from the heating
cartridges. Follow the electrical prints (in the pocket of the electrical enclosure door) to
disconnect the heater cartridge wires.
5.
Disconnect the pneumatic supply line from the connector on the manifold. (
Illustration 8.29
)
6.
Remove the socket cap screws that secure the manifold to the carry through plate and remove
the manifold.
7.
Remove the screws, (
M
) which hold the manifold end plate to the rest of the manifold body.
The entire inner assembly can be pulled out of the manifold body. Pay special attention to
the orientation of the end plate and the cartridges. Mark the outside of the endplate.
8.
Remove the heater cartridge unit from the manifold. Remove the lead wires from where they
pass through the end plate. Carefully thread the new lead wires through the end plate and
secure.
9.
Insert the new heater cartridge assembly into the manifold.
10. Replace the insulator that goes between the endplate and the manifold body. The insulator is
a special high temperature material used as a gasket.
11. Secure the end plate onto the end of the manifold in the same orientation that is was removed
using the screws (
M
).
12. Position the manifold in place based on the prior measurements or markings you made in step
3. Secure the manifold assembly into position using the two screws. There should be a
space of air between the manifold body and its guide and the guide should rise about ¼ inch
(6,4mm) above the top surface of the manifold body. (
Illustration 8.28
) Use the supplied
washers under the manifold feet to achieve the correct height.
13. Using the electrical drawings from the rear electrical enclosure, carefully wire the heater
cartridges back into the panel. (
Illustration 8.29
) Check the lead wires as they pass through
the channel systems to ensure that they are not interfering with the closing of the swing arm
or tangling on any other components.
14. Connect the pneumatic supply to the manifold’s connector. Secure the electrical cables from
the manifold to the carry through plate mounting shaft with cable ties. Make sure that the
cables do not interfere with the creaser assembly.
15. Install
the
swing
channel shrouding.
NOTE:
The AUTOTUNE function on the heat controller should be turned
ON and allowed to run after the following conditions:
1. The heater cartridges have been replaced.
2. The heat controller PID has been replaced.
Summary of Contents for PBC-6000
Page 69: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 72 this page left blank...
Page 71: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 75 this page left blank...
Page 73: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 78 this page left blank...
Page 75: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 81 this page left blank...
Page 77: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 84 this page left blank...
Page 79: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 87 this page left blank...
Page 81: ...FISCHBEIN Co MODEL PBC 6000 OPERATOR S MANUAL REV D 2005 03 90 this page left blank...