WARNING
During commissioning and during operation the slide
is moved at the highest possible acceleration and
speed. Make sure that:
- it is not possible to place one’s hand in the path of
the moving mass until the compressed air supply is
switched off;
- the complete positioning range of the axis is not
obstructed.
4.1 Preparing for commissioning
Before commissioning can be undertaken, the pneu-
matic drive must be ready for operation. In order to pre-
pare for commissioning, proceed as follows:
1. Check the complete system structure, especially the
cylinder tubing (see chapter 3).
2. Check the electrical circuitry.
3. Set the fixed stops exactly in the desired end posi-
tions, but always outside the path (PPV) of the end
position cushioning built in the cylinder (see chapter
3).
4. Then set the DIL switches according to the compo-
nents used and to the mass load to be moved.
Refer here to Appendix A.1.
4. Commissioning
SPC-10 9902a
4-3
Summary of Contents for SPC-10 Series
Page 1: ...Smart Soft Stop SPC 10 Electronic Pneumatic ...
Page 3: ...Order no 170 363 Title Manual Designation P BE SPC10 GB II SPC 10 9902a ...
Page 9: ...VIII SPC 10 9902a ...
Page 10: ...Chapter 1 Summary of system 1 Summary of system SPC 10 9902a 1 1 ...
Page 18: ...Chapter 2 Fitting 2 Fitting SPC 10 9902a 2 1 ...
Page 19: ...Contents 2 Fitting 2 1 Fitting the SPC 10 2 3 2 Fitting 2 2 SPC 10 9902a ...
Page 22: ...Chapter 3 Installation 3 Installation SPC 10 9902a 3 1 ...
Page 52: ...Chapter 4 Commissioning 4 Commissioning SPC 10 9902a 4 1 ...
Page 62: ...Chapter 5 Diagnosis and error treatment 5 Diagnosis and error treatment SPC 10 9902a 5 1 ...
Page 74: ...Appendix A Technical appendix Technical appendix SPC 10 9902a A 1 ...