35
HNC3 825 / HNC3 825 perform
Setup and installation
7 Setup and installation
7.1
Unpack machine
Video tutorial
Scan the QR code and watch the video instructions.
Or alternatively you can use this link: http://fg.am/hncfirststeps
Fig. 12: Packaging
Personnel:
●
Trained machine operator
Protective equipment:
●
Protective clothing
●
Protective gloves
●
Protective footwear
Tool:
●
Cutter knife
1.
Carefully remove the packaging.
2.
Retain the packaging, if required to dispose, then do so in accordance with
national regulations.
Summary of Contents for Hammer HNC3 825
Page 69: ......