38
Setup and installation
1
Fig. 14: Levelling the machine
1 Levelling feet
Personnel:
●
Trained machine operator
●
Additional assistant
Protective equipment:
●
Protective clothing
●
Protective gloves
●
Protective footwear
Tool:
●
Spirit level
An additional assistant is needed.
1.
Bring the machine to the site of installation.
2.
Level the machine in longitudinal and transverse direction with leveling
screws.
🡆
Machine table is level.
Summary of Contents for Hammer HNC3 825
Page 69: ......