With the vibration switched on, the measuring
value is displayed by the LED display (1-10).
If the display value does not increase any fur-
ther, no further compaction can be achieved
with this machine.
The maximum display value (10) is not always
reached.
Due to fluctuations in the measuring
value, the display value can vary by
one digit up/down during a pass.
The average display value during
the last pass is decisive.
The warning display (a):
n
Flashes for 1 - 2 seconds after the vibration
has been switched on. The display goes out
as soon as the vibration motor has reached
its nominal frequency.
n
flashes if the drum is in jump operation.
n
lights in case of faults
In order to achieve the desired compaction
condition of the road substructure or asphalt
layer, one must always perform a suitable ref-
erence measurement before compaction is
started.
The reference measurement is used to deter-
mine which display value of the ECONOMIZER
corresponds with the measuring value for soil
stiffness or asphalt density.
Tandem vibratory rollers of the same type show
identical measuring values when used on the
same soil.
Measuring operation
Fig. 93
Comparability of meas-
uring values
Operation – Working with vibration
BW 100 ADM-5
112
Summary of Contents for BOMAG BW 100 ADM-5
Page 9: ...1 Introduction Introduction BW 100 ADM 5 9 ...
Page 13: ...2 Technical data Technical data BW 100 ADM 5 13 ...
Page 18: ...Technical data Noise and vibration data BW 100 ADM 5 18 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65 ...
Page 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82 ...
Page 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83 ...
Page 97: ...6 Operation Operation BW 100 ADM 5 97 ...
Page 128: ...Operation Emergency procedures BW 100 ADM 5 128 ...
Page 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129 ...
Page 139: ...8 Maintenance Maintenance BW 100 ADM 5 139 ...
Page 194: ...Maintenance As required BW 100 ADM 5 194 ...
Page 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195 ...
Page 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200 ...
Page 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201 ...
Page 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206 ...
Page 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212 ...
Page 213: ...11 Disposal Disposal BW 100 ADM 5 213 ...
Page 215: ......
Page 216: ......