8.13.4 Measures prior to extended shut-down period
8.13.4.1 Measures before shutting down
If the machine is shut down for a longer period
of time, e.g. winter season, the following work
must be carried out:
1.
Clean the machine thoroughly.
2.
After shutting down store the machine
under cover in a dry and well ventilated
room.
3.
Grease the bare piston rods of all hydraulic
cylinders well and pull them in as far as
possible.
4.
Spray a thin oil film onto to all lever joints
and bearing points without lubrication.
5.
Repair damaged paint; preserve bare
areas thoroughly with anti-corrosive agent.
6.
Clean the water separator.
7.
Fill the fuel tank with diesel fuel to prevent
the formation of condensation water in the
tank.
8.
Change engine oil and oil filter if the oil has
been changed more than 300 hours ago, or
if the oil is older than 12 months.
B-462-0069
Fig. 190
Before the next use
Maintenance – As required
BW 100 ADM-5
190
Summary of Contents for BOMAG BW 100 ADM-5
Page 9: ...1 Introduction Introduction BW 100 ADM 5 9 ...
Page 13: ...2 Technical data Technical data BW 100 ADM 5 13 ...
Page 18: ...Technical data Noise and vibration data BW 100 ADM 5 18 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65 ...
Page 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82 ...
Page 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83 ...
Page 97: ...6 Operation Operation BW 100 ADM 5 97 ...
Page 128: ...Operation Emergency procedures BW 100 ADM 5 128 ...
Page 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129 ...
Page 139: ...8 Maintenance Maintenance BW 100 ADM 5 139 ...
Page 194: ...Maintenance As required BW 100 ADM 5 194 ...
Page 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195 ...
Page 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200 ...
Page 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201 ...
Page 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206 ...
Page 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212 ...
Page 213: ...11 Disposal Disposal BW 100 ADM 5 213 ...
Page 215: ......
Page 216: ......