![Fayat BOMAG BW 100 ADM-5 Operating Instruction Download Page 25](http://html1.mh-extra.com/html/fayat/bomag-bw-100-adm-5/bomag-bw-100-adm-5_operating-instruction_546856025.webp)
3.2 Definition of responsible persons
3.2.1 Operating company
The operating company is the natural or jurid-
ical person who uses the machine or in who's
name the machine is used.
The operating company must make sure that
the machine is only used for the purpose it is
intended for and in strict compliance with the
safety regulations mentioned in these operating
and maintenance instructions.
The operating company must determine and
assess the danger in its company. It must then
take appropriate action to ensure health and
safety at work for its employees and point out
any remaining dangers.
The operating company must determine
whether there are special operational hazards
such as a toxic atmosphere or limiting soil con-
ditions. Such conditions require special, addi-
tional measures to remove or reduce the
hazard.
The operating company must make sure that
all users read and understand the information
concerning safety.
The operating company is responsible for the
planning and professional execution of regular
safety inspections.
3.2.2 Expert / qualified person
An expert / qualified person is a person who,
based on his/her professional education and
experience, has profound knowledge in the
field of construction equipment and the
machine in question in particular.
Concerning your safety – Definition of responsible persons
BW 100 ADM-5
25
Summary of Contents for BOMAG BW 100 ADM-5
Page 9: ...1 Introduction Introduction BW 100 ADM 5 9 ...
Page 13: ...2 Technical data Technical data BW 100 ADM 5 13 ...
Page 18: ...Technical data Noise and vibration data BW 100 ADM 5 18 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65 ...
Page 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82 ...
Page 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83 ...
Page 97: ...6 Operation Operation BW 100 ADM 5 97 ...
Page 128: ...Operation Emergency procedures BW 100 ADM 5 128 ...
Page 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129 ...
Page 139: ...8 Maintenance Maintenance BW 100 ADM 5 139 ...
Page 194: ...Maintenance As required BW 100 ADM 5 194 ...
Page 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195 ...
Page 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200 ...
Page 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201 ...
Page 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206 ...
Page 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212 ...
Page 213: ...11 Disposal Disposal BW 100 ADM 5 213 ...
Page 215: ......
Page 216: ......