![Fayat BOMAG BW 100 ADM-5 Operating Instruction Download Page 111](http://html1.mh-extra.com/html/fayat/bomag-bw-100-adm-5/bomag-bw-100-adm-5_operating-instruction_546856111.webp)
6.6.5 Stop working with vibration
1.
Switch the vibration off.
2.
Turn the rotary switch for vibration pre-
selection to position “Middle”.
6.6.6 ECONOMIZER
The ECONOMIZER continuously informs the
driver about the compaction status of the road
subbase or the asphalt layer and enables the
detection and selected re-compaction of weak
spots.
The acceleration transducer on the front drum
measures the reaction of the road subbase on
the vibrating drum.
The ECONOMIZER is automatically started by
switching the ignition on.
The ECONOMIZER first of all runs an LED-
test. The LEDs light up one after the other,
starting with LED (1). Once all LEDs are on,
the display goes out again in single steps.
B-SWI-1485
Fig. 92
Start process
Operation – Working with vibration
BW 100 ADM-5
111
Summary of Contents for BOMAG BW 100 ADM-5
Page 9: ...1 Introduction Introduction BW 100 ADM 5 9 ...
Page 13: ...2 Technical data Technical data BW 100 ADM 5 13 ...
Page 18: ...Technical data Noise and vibration data BW 100 ADM 5 18 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65 ...
Page 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82 ...
Page 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83 ...
Page 97: ...6 Operation Operation BW 100 ADM 5 97 ...
Page 128: ...Operation Emergency procedures BW 100 ADM 5 128 ...
Page 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129 ...
Page 139: ...8 Maintenance Maintenance BW 100 ADM 5 139 ...
Page 194: ...Maintenance As required BW 100 ADM 5 194 ...
Page 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195 ...
Page 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200 ...
Page 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201 ...
Page 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206 ...
Page 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212 ...
Page 213: ...11 Disposal Disposal BW 100 ADM 5 213 ...
Page 215: ......
Page 216: ......