1.1 Foreword
BOMAG manufactures machines for earth,
asphalt and refuse compaction, stabilizers/
recyclers as well as planers and pavers.
BOMAG’s vast experience in connection
with state-of-the-art production and testing
methods, such as lifetime tests of all impor-
tant components and highest quality
demands guarantee maximum reliability of
your machine.
These operating and maintenance instructions
are part of your machine.
They provide necessary information to operate
your machine safely and properly.
They also contain information on required oper-
ating, maintenance and repair measures.
Carefully read the operating and maintenance
instructions before taking your machine into
operation.
Please observe the safety regulations strictly
and follow all instructions to ensure safe opera-
tion.
If you are not yet acquainted with the controls
and indicating elements on this machine, you
should thoroughly read the corresponding
Chapter 4 ‘Indicators and control
.
The description of the individual operating
steps including the notes on safety to be fol-
lowed can be found in chapter “Operation”
Chapter 6 ‘Operation’ on page 97
Before every start up, carry out all required
visual inspections and function tests
5 ‘Checks prior to start up’ on page 83
Ensure the compliance with the specified oper-
ating, maintenance and repair measures to
maintain the functional safety of your machine.
Introduction – Foreword
BW 100 ADM-5
10
Summary of Contents for BOMAG BW 100 ADM-5
Page 9: ...1 Introduction Introduction BW 100 ADM 5 9 ...
Page 13: ...2 Technical data Technical data BW 100 ADM 5 13 ...
Page 18: ...Technical data Noise and vibration data BW 100 ADM 5 18 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65 ...
Page 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82 ...
Page 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83 ...
Page 97: ...6 Operation Operation BW 100 ADM 5 97 ...
Page 128: ...Operation Emergency procedures BW 100 ADM 5 128 ...
Page 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129 ...
Page 139: ...8 Maintenance Maintenance BW 100 ADM 5 139 ...
Page 194: ...Maintenance As required BW 100 ADM 5 194 ...
Page 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195 ...
Page 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200 ...
Page 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201 ...
Page 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206 ...
Page 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212 ...
Page 213: ...11 Disposal Disposal BW 100 ADM 5 213 ...
Page 215: ......
Page 216: ......