- 16
removed by cutting the cable tie and removing the clamshell. Store the shipping
bracket for future use. Each machine comes with an additional cable tie.
Vacuum Pump Installation:
The Vacuum Pump descends into bins during vend cycles to retrieve products
and dispense them into the delivery bin. It has successfully taken the place of
the hoses and cables that were used on earlier machines. The Vacuum Pump is
wrapped and placed in the Evolution Vendor’s Delivery Bin prior to shipping.
Retrieve the Vacuum Pump from the Delivery bin and remove the packing
material. Locate the Lift Cable in the front of the Robot Arm. The cable has been
secured with a red cable tie. Carefully cut the cable tie using cutter pliers and
discard. Support the Robot Arm and pull down on the cable to generate slack in
the cable. Align the spline inside the lock ring on the end of the cable with the
spline on the top of the Vacuum Pump. Carefully, insert the pump into the lock
ring and hand-tighten. Do not use tools -
Hand tighten only.
Turning On the Machine
Note: Before turning on the machine, make sure the shipping brackets have
been removed. The Robot Arm should move freely in every direction and the
Freezer Lid must open and close without restriction.
Power Box
The Power Box is the primary power source for the vendor. It is located on the
rear cabinet wall behind the Freezer. There is an ON/OFF Power Switch located
on top of the Power Box that supplies power to the Freezer, the lamps and the
Power Supply located below the Product Delivery Bin on the bottom of the Front
Door. The Power Box has (1) input - Power Cord with GFCI and (2) outputs -
Freezer and Power Cord to the Power Supply.
Power Supply
The Power Supply is located below the Product Delivery Bin on the bottom of the
Front Door. The Power Supply has an ON/OFF switch located on the left side of
the box which supplies power to the VMC, the Robot Arm, the Digital Display and
the Currency/Telemetry systems.
To turn on the machine, first turn “ON” the Power Box Switch (behind the freezer)
and then turn “ON” the Power Supply Switch (below the delivery bin on the
bottom of the door). The Freezer and lamps will turn on, the Robot Arm will
present itself at the Delivery Position, the Display will light up and the machine
will be ready for Programming. Press the VAC button then scroll to Service
Menu Option 13 to set the Health Timer so that the machine can be set up before
the Freezer cools down. See the Service Menu section for instructions.
To Purchase This Item, Visit BMI Gaming | www.bmigaming.com | (800) 746-2255 | + 561-391-7200