
Diesel engine Series 15B / 18B
Maintenance
2008-09-08
85
Fig. 18
15. Tighten the high pressure line (3) on the injection nozzle
holder.
Tightening torque 25 Nm
16. Replace valve cover gasket.
Fig. 19
17. Install valve cover (2) using two plastic seals in the process.
18. Tighten both nuts (1) of the valve cover (2).
Tightening torque 8-12 Nm
NOTE!
Always replace the valve cover gasket and the two
plastic seals under the nuts of the valve cover.
Pos: 9.1 /KN2006-Projekte/Bukh-Farymann/Störungen/1 Störungen @ 48\mod_1191331711711_2.doc @ 637107