ATTENTION: Study the control board and read this section
thoroughly before attempting to operate your gate opener.
Control Board Layouts
Warnings:
Before attempting any job on the control board (connections, maintenance), turn
off electrical power and unplug the support battery.
Install a surge protector upstream of your opener, the opener is not power surge
proof nor will power surge damage be covered under warrantee.
Always separate power from control and safety cables (push
-
buttons, receivers,
photocells, etc.). To avoid any electrical noise, use separate sheaths or a shielded
cable (with earthed shield).
Lay
out
of
Ma
ste
r C
ont
rol Boar
d
Lay
out
of
Slav
e Con
tr
ol
Boar
d
LED
Programming LEDs
P
Power ON and diagnostics LED
P1
“Function” programming push
-
button
P2
“Value” programming push
-
button
F1
Battery and motor fuse
-
F15A
J1
Accessories Terminal board
J2
Transformer Terminal board
J3
Motor connection terminal
J4
Battery connector
J5
Minidec connector/RP receiver
P
Power ON and diagnostic LED
F1
Battery and motor fuse
-
F15A
J2
Bus connection terminal board
J3
Motor connection terminal board
J4
Battery connector
2.1
Estate Swing
Summary of Contents for Estate Swing E-S 1100 Series
Page 51: ...9 4 Estate Swing...