19
ENGLISH
fig. 22
fig. 23
Refer to tables A or B for each right or left leaf to drill the 5 mm diameter holes on the outside of the
telescopic profile, as shown in fig. fig.22 Ref.
d to secure the plate(s) of the steel cable.
Use the line on the telescopic profile fig.22 Ref.
band corresponding template to keep the 2 plate holes aligned.
Open the external leaves completely until they come in contact with the external mechanical stops fig.22 Ref.
.
Use the reference line on the telescopic profile fig.22 Ref.
Then secure the plates using the provided screws fig.22 Ref.
.
Assemble the internal carriages .
Assemble the supports and the bracket fig.23 Ref.
.
Fit the belt coupling unit fig.23 Ref.
.
2A - 2 PREPARING THE INTERNAL CARRIAGES