
100
Set DUT I/P voltage to 220VAC and connect a 5 ohm load. Connect power meter in series
with the DUT. When the load is connected, press TEST to activate the calibration. Read the
measurement from your standard and enter it using the numeric keypad. You may now store
the new calibration number by pressing the ENTER key or escape by pressing the EXIT key
or the RESET button.
5.
RUN TEST 1kW
:
Calibration of Run Test Power 1kW
Set DUT I/P voltage to 220VAC and connect a 60 ohm load. Connect power meter in series
with the DUT. When the load is connected, press TEST to activate the calibration. Read the
measurement from your standard and enter it using the numeric keypad. You may now store
the new calibration number by pressing the ENTER key or escape by pressing the EXIT key
or the RESET button.
6.
RUN TEST Leakage
:
Calibration of Run Test Leakage