3. Starting up the unit for operation
The Modbus connectors must not be connected or removed while the
units are powered up. Both Modbus units must be switched off before
making changes, otherwise the units may be damaged.
During commissioning, it may be necessary to work with the control
system boxes open. Components in these boxes must only be
touched with electrically-insulated tools.
Before doing any work on motor controls or motor cables and termi-
nal boxes, the power supply must be switched off for at least five mi-
nutes to allow the capacitors to discharge.
Before commission-
ing begins
● Check that the supply voltage is connected
● Set the HMI panel to specialist mode. See section 2.2
3.1 Getting started
From the main menu, follow the steps below to start the commissioning process.
Commissioning
Step
Action
Menu
1
Configure any external accessories or units (heating or
cooling coils, chiller, sensors, etc.)
3.4
2
Select operating mode - Manual operation is the recom-
mended setting during commissioning.
1
3
Set/activate operation settings
3.1
4
Program weekly plan
5.2
5
Set safety function settings
7
6
Select operating mode - change to timer operation if re-
quired
1
The various menu items are explained later in this section.
REMEMBER - Save
settings
After changing menu settings it is always important to return to the main menu to
save your settings by selecting "Save settings" in menu 10 (select yes). If power is
disrupted before the settings are saved, the changes must be re-entered.
Main menu
Operating mode >
Operating readings >
Settings >
Alarm and info >
Time and weekly plan >
Versions >
Safety functions >
Service >
Exit technician menu >
Save settings >
10 Save settings
Save settings >
Last saved:
Date
Time
No
15.02.2011
15:30.22
3005167-2022-02-02
Starting up the unit for operation
16/108
Summary of Contents for EXact2 VEX240 series
Page 105: ...3005167 2022 02 02 105 108...
Page 106: ...3005167 2022 02 02 106 108...
Page 107: ...3005167 2022 02 02 107 108...
Page 108: ......