First Steps, Commissioning
Instruction Manual ATS 400 with SC-NG
Version 4.03
23
6
First Steps, Commissioning
Install the test system at a suitable and permissible place.
Plug in the main cable (contained in the scope of delivery) on the back side oft he
device and regard the power supply: 230 V, 50 - 60 Hz.
If necessary assign the safety circuit (SHK) resp. plug in the safety circuit plug of
the supplies (e.g. test cage).
Plug the warning lamp in the plug-in connector „WK400“ on the back side of the
test system.
If necessary plug in operation components such as keyboard, barcode reader or
mouse (possible depending on the equipment type).
If necessary establish the connection to the network. Establish the connection to
the Ethernet with a fitting patch plug. In case of an X6 or X8 equipment type the
test system can be involved in the network (XP-Professional).
Install the connections on the power side. Either plug in the round high voltage
plugs like denoted or establish all connections with one plug-in mount if you have
a test system with system connector. Secure the HV-plugs with the dedicated
fittings resp. the system connector with the locking lever!
If necessary plug in the test probe for the protective earth conductor test.
If necessary connect operation panels or PLC controls with the ETL-Interface.
If necessary establish the connection to a superordinate control, e.g. via the
RS232-Interface for the connection of a PC application.
DANGER
Estimation of the test place and training of the personnel:
Have all guidelines of the standards, especially those of the EN 50191, been kept resp.
implemented?
Have you realised the necessary instructions of the test persons, e.g. electrically
instructed person, necessary for electrotechnical laypersons?
Turn on the test system.