Proline Promag L 400 HART
Appendix
Hauser
153
Conductivity damping
(1803)
Low flow cut off
®
Assign process variable
(1837)
On value low flow cutoff
(1805)
Off value low flow cutoff
(1804)
Pressure shock suppression
(1806)
Empty pipe detection
®
Empty pipe detection
(1860)
Switch point empty pipe
detection (6562)
Response time empty pipe
detection (1859)
New adjustment (6560)
Progress (6571)
Electrode cleaning
circuit*
®
Electrode cleaning circuit
(6528)*
ECC duration (6555)*
ECC recovery time (6556)*
ECC cleaning cycle (6557)*
ECC polarity (6631)*
Calculated process
variables
®
Reference values
®
Fixed density (1862)
Sensor adjustment
®
Installation direction (1809)
Integration time (6533)
Measuring period (6536)
Variable adjust
®