Carbon analysis with the TOC module
multi EA 5000
98
1
2
3
4
5
6
7
Figure 63TOC detector, door opened
1 Water traps
2 Measuring gas hose from the basic
module (hose 80)
3 Condensate pump
4 TIC reactor
5 Cooling block (measuring gas dryer)
6 Halogen trap
7 Hose 81
Preparing the basic module
}
Fill the TOC combustion tube as shown in the illustration.
}
Insert the TOC combustion tube into the combustion furnace of the basic module.
Connect the oxygen supply (hose 3). Fasten the combustion tube with the tube
holder.
}
Install the condensation coil in the basic module. Connect the condensation coil with
the TOC combustion tube with the spherical joint. Secure the spherical joint connec-
tion with a clamp.
}
Connect the condensation coil to the TIC reactor in the detection module with hose
80. Route the hose through the side openings of the modules for this.