Insert approx. 500 mg of quartz glass wool in the combustion tube. Carefully press
the glass wool down to a height of approx. 1 cm with a glass rod. Do not press it
down too tightly.
}
Carefully pour 16 g of platinum catalyst onto the quartz wool (fill height approx
4 cm).
}
Cover the catalyst completely with approx 250 mg of quartz glass wool. Carefully
tamp down the quartz wool.
}
Fill approx. 10 g of ground quartz glass into the combustion tube (fill height approx.
2 cm).
}
Cover the ground quartz glass with a piece of high temperature fiber mat (HT mat)
(layer height approx 1 cm).
}
Close the filled TOC combustion tube with septum and screw cap and reinstall it in
the furnace in reverse order.
}
Check the analysis system for leaks.
ü
The analysis system is ready for operation again.
1
2
3
4
5
Figure 81TOC combustion tube
1 HT mat
2 Quartz glass fragments
3 Quartz wool
4 Catalyst
5 Quartz wool
NOTICE
The catalyst may emit gas during first heating, this can be seen as mist formation in the
TIC reactor.
¡
Allow the catalyst to normalize during first heating for approx. 30 min until mist no
longer forms. Disconnect the gas path between the TIC reactor and the water traps