multi EA 5000
Troubleshooting
115
Error
Possible cause
Remedy
Scattering measurements
Dosing faulty
Check dosing
Combustion tube contam-
inated or severely crystal-
lized
Clean or replace combus-
tion tube
13.7 Device faults on the CLD 5000
Error
Possible cause
Remedy
LED in front panel flash-
ing
Ozone generator off
¡
Run-in period of de-
tection module not
yet complete
¡
Wait for the comple-
tion time for the run-
in period of approx
30 min to elapse.
¡
Device in standby
¡
Initialize the device
¡
Gas deactivated
¡
Activate gas flow, see
software manual
¡
Module not con-
nected to basic mod-
ule
¡
Connect module (→
"Installation"
¡
No method or
method with no CLD
active
¡
Activate a method
with nitrogen detec-
tion
¡
Other fault causes
¡
Check the condition
of the module under
System |Component
test
Pressure error
¡
Gas outlet flow im-
peded
¡
Check the "sample
out" connection for
unimpeded flow
¡
Absorber clogged
¡
Replace absorber (→
"Replacing the ab-
sorber"
¡
Converter worn out/
old
¡
Inform customer ser-
vice department
¡
Pump faulty
¡
Inform customer ser-
vice department
¡
Device leaking or de-
fective
¡
Inform customer ser-
vice department
Exhaust gas temperature
outside range
¡
Run-in period of de-
tection module not
yet complete
¡
Wait for the comple-
tion time for the run-
in period of approx
30 min to elapse.
¡
Thermal ozone de-
composer defective
¡
Inform customer ser-
vice department
Heating temperature sen-
sor defective
¡
Thermal ozone de-
composer defective
¡
Inform customer ser-
vice department