Preparing for installation
Prerequisites
The Emerson Wireless Gateway should be installed and functioning properly
before commissioning the Rosemount ET310 and powering it with a BP20E
power module.
Note
Wireless devices should be powered up in order of proximity from the
Gateway, beginning with the closest device, then working outward from the
Gateway. This results in a simpler and faster network formation. Enable
Active Advertising on the Gateway to ensure new devices are able to join the
network faster. For more information, see the
.
Procedure
1. Identify the location where the sensor is to be installed.
2. Ensure all cladding and insulation is removed around the
circumference of the pipe at the sensor location.
The dimension drawing in
provides guidance on how
much pipe should be exposed.
Note
Cladding or insulation can be replaced after the sensor installation is
completed, provided that the head of the sensor remains outside of
the insulation. Insulation materials can be installed around the sensor
as desired and according to local procedures.
Quick Start Guide
January 2022
8
Emerson.com/Rosemount
Summary of Contents for Rosemount ET310
Page 4: ...Quick Start Guide January 2022 4 Emerson com Rosemount ...
Page 42: ...6 14 China RoHS Quick Start Guide January 2022 42 Emerson com Rosemount ...
Page 44: ...Quick Start Guide January 2022 44 Emerson com Rosemount ...
Page 50: ...Quick Start Guide January 2022 50 Emerson com Rosemount ...
Page 51: ...January 2022 Quick Start Guide Quick Start Guide 51 ...