
Part 4: Installation and Start-up
Installation
39
Pin
No.
Senso
r No.
Function 1
Function 2
Function 3
1 F9
AF
Exterior sensor
2 F8
KF
Sensor collector/heat generator1
3 F6
SPF
Storage tank sensor
4 F5
VF
Flow sensor HC 2
5 F3
FBR Terminal 3 Room set value/Telephone switch HC1 Buffer top
6 F2
FBR Terminal 1 Room sensor HC1
Buffer middle
7 F1
Buffer bottom (solar zone)
Buffer bottom
8 F11
VF
Flow sensor HC 1
Sensor multifunction 1
9 F12
SPF
Storage tank sensor bottom
Sensor multifunction 2
10 F13
PT 1000
Heat generator 2/ Solar collector 2
Sensor multifunction 3
11 F14
PT 1000
Solar collector 1
Sensor multifunction 4
12 F15
FBR Terminal 1 Room sensor HC2
0-10V -input
storage tank 3
13 F17
FBR Terminal 3 Room set value/Telephone switch HC2 Return flow sensor
refrigeration machine
14
eBUS +
Combustion machine / DCF
0-10V + for heat generator
15
eBUS -
Combustion machine / DCF
0-10V - for heat generator
16 H
CAN BUS
High data line
17 L
CAN BUS
Low data line
18 -
CAN BUS
Power supply (measurement)
19 +
CAN BUS
Power supply (+)
Connection diagram
Establish bridge to the collective terminal block.
Connect the collective terminal block with the same
potential
~230V; Relay switching capacity 2(2)A, ~250V
Triac switching capacity 1(1)A, ~250V
Establish bridge from terminal 22 to 38