Gold Bell Installation Guide
MAN-G-BELIG (Ver. 1.200)
|Connector J2 |
www.elmomc.com
54
Table of Contents
Chapter 10:
Powering Up
After the Gold Bell is connected to its device, it is ready to be powered up.
Caution:
Before applying power, ensure that the DC supply is within the specified range
and that the proper plus-minus connections are in order.
10.1
Initializing the System
After the Gold Bell has been connected and mounted, the system must be set up and initialized.
This is accomplished using the
EASII
, Elmo’s Windows-based software application. Install the
application and then perform setup and initialization according to the directions in the
EASII User
Manual
.