9.5
Main Power and Control Connector
There are two power ratings for the Gold Bell:
•
100V for is 12 to 95 VDC
•
200V for the 12 to 195 VDC
For power rating 200V
Two DC power sources are required, a DC power source of 12 to 195V isolated from the Mains, and
a control supply 12 to 95V (isolated from the Mains) for the logic.
For power rating of 100V
Only a single DC Power source of 12 to 95 VDC isolated from the Mains, is required for the main
power and also for the control power. However, a control power supply can be added for the logic.
9.5.1
Main Power
Pin
Function
Cable
Pin Positions
VP+
Pos. Power input
Power
PR
Power return
Power
PE
Protective earth
Power
Connector Type: 2 mm pitch 0.51 mm sq
Table 4: Connector for Main Power
Note:
The 12V to 195V DC power source must be from the Mains.
Connect the DC power source cable to the VP+ and PR terminals on the main power connector.
To connect your integration board to the DC power source:
1.
The DC power supply source must be isolated from the Mains.
2.
For best immunity, it is highly recommended to use twisted and shielded cables for the DC
power source. A 3-wire shielded cable should be used. The gauge is determined by the actual
current consumption of the motor.
3.
Connect the cable shield to the closest earth connection near the power supply.
4.
Connect the PE to the closest earth connection near the power supply.
5.
Connect the PR to the closest earth connection near the power supply.
6.
Before applying power, first verify the polarity of the connection.