14
Programme unit
972
X7
6
6
6. Switch off the machine’s main power switch.
Install the new CPU board and connect all the
PCB connectors. Connect the correct cable
between the computer (COM1 port) and the
interface connector X7 on the CPU board.
Switch the machine’s main power switch
back on.
7. Click OK. The downloading is started. An indi-
cation that downloading is working OK is that
the two LED's at the lower left corner Red Tx
and Yellow Rx are flashing within one minute.
The computer will now process and adapt
the five files for downloading onto the CPU
board. This will take a minute or so.
8. When downloading is finished, the PC
screen will tell you that the software is OK.
9. Switch off the machine’s main power switch.
Remove the cable linking PC and CPU
board. Switch the machine’s main power
switch back on. The PCU will now start up
with the new software.
CPU circuit board
Summary of Contents for W4400H
Page 1: ...Service Manual W4400H W3600H W3850H W31100H Clarus Control 438 9206 51 06 22 ...
Page 2: ......
Page 6: ... ...
Page 14: ...14 ...
Page 18: ...18 ...
Page 64: ...64 ...
Page 72: ...72 ...
Page 146: ...146 ...
Page 164: ...164 ...
Page 166: ...166 ...
Page 185: ......
Page 186: ...www electrolux com professional Share more of our thinking at www electrolux com ...